The boat is fine. The instruments are running. The logbook is open to a blank page. The crew is a separate matter.
HARLAN’S CREEK, WV — The flat-bottomed survey vessel deployed Monday afternoon by the Harlan’s Creek Water Authority to assess an unusually large submerged object near the Copperhead Bend culvert was recovered at the municipal dock at approximately 3:40 a.m. Tuesday, in what the Authority is describing as good condition. All onboard instruments were still active at the time of recovery. The vessel’s logbook was open. The page was blank. The three-person crew has not been located.
Water Authority Director Pamela Ostroff confirmed the recovery in a brief statement Tuesday morning, noting that the vessel showed no signs of distress and that an inventory of equipment confirmed everything present and accounted for. Director Ostroff added that the crew’s absence was being treated as an administrative matter, and that the department was making the appropriate notifications. She did not specify which notifications or to whom. She described the overall situation as ongoing.
The boat came back. We are very glad the boat came back. The crew situation is a separate line item.
— Pamela Ostroff, Harlan’s Creek Water Authority Director
The submerged object that prompted the survey deployment was first reported Saturday evening by four residents on the Copperhead Road bridge, who described it as stationary, flat along the top, and, in the words of one witness who asked to be identified only as having been there, considerably larger than a car and considerably less like a log than the Water Authority’s initial public statement had suggested. A second group of residents at the same bridge Sunday night reported that the object had changed position. The Water Authority did not confirm the second report, though it did deploy the survey vessel the following afternoon, which Director Ostroff has not characterised as a response to the second report.
As of this morning, the object has not been relocated. The Water Authority states that conditions near the Copperhead Bend culvert remain under review and that the water testing schedule is subject to revision pending crew availability. Sheriff Linda Calhoun confirmed that her department responded to the dock at approximately 4 a.m. and that the matter is being handled through the appropriate channels. She confirmed no further details. DCA Field Representative Arthur Bellamy was reached by phone and remained on the line for an extended period before stating that he would not characterise the situation in the way it had been characterised to him. He did not offer an alternative characterisation. The call then concluded.
This is Hal Ridgeway. The object near Copperhead Bend has not been relocated. Authorities continue to urge caution. Water testing continues to be delayed. The boat is at the dock. Reporting continues.
haroldridgeway@whatthecryptid.com Harold “Hal” Ridgeway · Lead Anchor — WTC Facebook